Introduction to MS Dynamics NAV XXVII. (Production) Ing.J.Skorkovský,CSc. MASARYK UNIVERSITY BRNO, Czech Republic Faculty of economics and business administration Department of corporate economy Production -basics •What to produce –BOM (Bill of Material) • –A BOM is a listing of all the subassemblies, intermediates, parts and raw materials that go into a parent item. –Statuses : New, Under Development, Certified and Closed (archived) –Production BOMs manage the material requirement of production exclusively. –Production BOMs may consist of several levels. You can use up to 50 levels. – – – – – – – – BOM Production -basics •What resources will be used • –Machine Centers •Machines •Workers (only MC) •Costs •Load •Statistics •Absence •Load •Sent-Ahead Quantity (only MC) •Capacity –In general, the capacity is the amount of work that can be done in a specified time period. The capacity of a machine center indicates how many machines or persons are working at the same time. For example, if the capacity is two, it means that twice as much work can be done at the same time •Efficiency –Efficiency measures the output of a machine center relative to the standard output expected. If you enter 100, it means that the machine center will have an actual output that is the same as the standard output – – – – – – – – – – Machine Centers (MC) Production -basics •What resources will be used • –Work Centers •Related machines (group of machines) •Capacity •Efficiency •Costs •Load •Statistics •Absence •Shop calendar (not in MC) •Alternate Work Center (not in MC) •Unit of Measure Code (not in MC) • • • – – – – – – – – – Work Centers (WC) Production -basics •How the final product will be produces • –Routing •Statuses (similar to BOM) •Serial and Parallel operations mode •Operations •Setup and production times •Waiting and Move times •Send-Ahead Quantity •Scrap calculation •Standard Task Codes • • • – – – – – – – – – Routing MRP and MRP-II in NAV Production order 1 Today DUE date Production order 2 Production order 1 Production order 2 Production Order (manually created) F3, Enter, Item, F6->1150->Quantity=100->Function-> ->Refresh->Backward->Ticked (lines, routings and components) Components from PO Routing from PO SEE NEXT SLIDE Routing Statistics from PO Status change •PO button Function ->Change unit status ->Released New Released PO has the same structure like Firmed Planned PO !!! Consumption from Released PO Production Journal I. You have to enter Setup times and real Run times for every lines SEE NEXT SLIDE Production Journal II. SEE NEXT SLIDE PO Entries and Statistics (F9) Change status PO->Finished End of the section XXVI. Přihlásit se Používáte-li nástroj pro čtení obrazovky, vypněte Dynamické vyhledávání Google kliknutím sem. Internet Obrázky Videa Zprávy Nákupy Více Vyhledávací nástroje Bezpečné vyhledávání Výsledky hledání I RemixYourHealth Workout Series: The Show Stopper | RemixYourHealth remixyourhealth.com-940 × 400-Vyhledávání pomocí obrázku So two weeks ago I introduced you to the ridiculousness that was “The Shredder” workout. Did you try it? How'd it go? If you made it to the end of the ... Navštívit stránku Zobrazit obrázek Související obrázky: Zobrazit další Na obrázky se mohou vztahovat autorská práva.-Odeslat zpětnou vazbu Not Dead Yet Radio | Podcast featuring Tommy Bateman & Alex Corolla www.notdeadyetradio.com-447 × 280-Vyhledávání pomocí obrázku Tommy starts the show off in an unusual fashion. He announces the show is ending. The time he puts in isn't worth the “rewards” he's getting. Navštívit stránku Zobrazit obrázek Související obrázky: Zobrazit další Na obrázky se mohou vztahovat autorská práva.-Odeslat zpětnou vazbu G4 Cancels 'Attack of the Show,' 'X-Play' - Hollywood Reporter www.hollywoodreporter.com-565 × 318-Vyhledávání pomocí obrázku Attack of the Show Logo (2) - H 2012 Navštívit stránku Zobrazit obrázek Související obrázky: Zobrazit další Na obrázky se mohou vztahovat autorská práva.-Odeslat zpětnou vazbu