Inspection Defect Summary Project: Activity: Component: ____________________ ____________________ ____________________ Meeting Date: Release: Document: Moderator: _________________________ _________________________ _________________________ _________________________ Meeting Type: □ Inspection (I) □ Re-Inspection (R) □ Maintenance (M) Inspection Type: □ Requirements (RE) □ Architecture (AR) □ High Level Design (HD) □ Detail Design (DD) □ Code (CD) □ Unit Test Plan (UTP) □ Unit Test Case (UTC) □ Integration Test Plan (ITP) □ Integration Test Case (ITC) □ System Test Plan (STP) □ System Test Case (STC) Disposition: □ Accept (A) □ Conditional (C) □ Re-Inspect (R) Defect DA: Data DC: Documentation FN: Functionality HF: Human Factors IF: Interface IO: Input/Output LO: Logic MN: Maintainability PF: Performance SN: Syntax ST: Standards TC: Test Case TE: Test Environment TP: Test Plan OT: Other Total MINOR DEFECTS M W E Total MAJOR DEFECTS M W E Total