Session 2: EU Energy Law: Energy security, Internal energy market, April 16, 10:00 - 13:40
-
Energy security
o Obligation
to maintain minimum stocks of crude oil and petroleum products
o Security
of gas supply
-
Internal energy market
o
Liberalisation
of EU electricity and gas market
o
Internal
market in electricity
o
Internal
market in gas
o
Agency
for cooperation between EU energy regulators (ACER)
o
Modern
energy infrastructure is crucial for the EU to integrate its energy market
o
Third-party
access
o
Unbundling
of TSOs and DSOs
o
Cross-border
cooperation: ENTSO-E and ENTSO-G
Compulsory reading:
-
Energy Security: Managing Risk in a Dynamic Legal and Regulatory
Environment. BARTON,
Barry et al. Oxford: Oxford University Press, 2004.
§ HANCHER, Leigh; JANSEN, Sally. Shared Competences and Multi-Faceted
Concepts – European Legal Framework for Security of Supply (pages 85-119).
-
Routledge Handbook of Energy Law ed. Tina Soliman Hunter, Ignacio Herrera
Anchustegui, Penelope Crossley and Gloria M. Alvarez
§ Anchustegui, Ignacio Herrera and
Andreas Formosa,
"Regulation of electricity markets in Europe in light of the Clean Energy
Package" (pages 90-107)
§ Sirja-Leena Penntinen, Energy Market Liberalization: From
monopolistic to traded markets in the European Union (pages 77-89)
-
DIRECTIVE 2009/119/EC
§
Preamble
(8) – (11)
§
Art.
1, 3, 5, 7, 8, 17, 20
-
REGULATION (EU) 2017/1938
§ Preamble (1), (3) – (11), (31) –
(34), (37) – (46), (55) - (60)
§ Art. 1, 3 – 8, 11, 12, 13
-
REGULATION (EC) No 715/2009
- Preamble (1), (3), (4), (12),
(15), (16)
- Art. 1 (Subject matter and
scope), Art. 4 (European network of transmission system operators for
gas), Art. 5 (ENTSO-G), Art. 6 (Establishment of network codes), Art. 8
(Tasks of the ENTSO for Gas), Art. 14 (TPA services concerning transmission
system operator), Art. 16 (Article 16 Principles of capacity-allocation
mechanisms and congestion-management procedures concerning transmission
system operators)
-
REGULATION (EC) No 714/2009
§ Preamble (1), (3), (6), (7), (10)
- Art. 1 (Subject matter and scope),
Article 4 (European network of transmission system operators for
electricity), Article 5 (Establishment of the ENTSO for Electricity),
Article 6 (Establishment of network codes), Article 8 (Tasks of the
ENTSO for Electricity), Article 16 (General principles of congestion
management)
-
REGULATION (EC) No 713/2009
§
Preamble
(2), (3), (5), (6), (7), (8), (9), (11), (12), (18), (29)
- Art. 1 (Subject matter and scope), Art.
4 (Type of acts of the Agency), Art. 5 (General Tasks).
-
DIRECTIVE 2009/73/EC
§
Preamble
(1), (6) - (9), (11), (12), (13) - (18), (25), (29)-(33)
- Art. 1 (Subject matter and scope), Art. 9 (Unbundling), Article 14 (ISO),
Art. 24 – 25 (DSO), Art. 26 (Unbundling of DSOs), Art. 32 (Third-party
access), Art. 39-41 (National regulatory authorities)
-
DIRECTIVE 2009/72/EC
§
Preamble
(1), (4), (6), (9) – (12), (15)
- (20), (26), (31) – (35)
- Art. 1 (Subject matter and scope), Art.
7 (Authorisation procedure for new capacity), Art. 8 (Tendering for new
capacity), Art. 9 (Unbundling
of TSO), Art. 12 (Tasks of TSO), Art. 13 (ISO), Art. 24-25 (DSO), Art.
26 (Unbundling of DSOs), Art. 35-37 (National regulatory authority)
-
REGULATION (EU) No 347/2013
- Preamble (7)
- Art. 1, 4, 8
- ANNEX I ENERGY INFRASTRUCTURE PRIORITY
CORRIDORS AND AREAS, ANNEX II ENERGY INFRASTRUCTURE CATEGORIES
-
DIRECTIVE (EU) 2019/944
§ Preamble: (1) – (13), (18), (31) –
(37), (43- (44), (46) – (49), (58) – (60)
§ § Art. 1, 4 - 6, 8, 10, 10 – 20,
28-29, 31, 33, 35, 40, 43-48
-
REGULATION (EU) 2019/943
§ Preamble: (1) – (9), (42) – (43), (46),
(48) – (50), (51), (60)
§ Art. 1, 3, 4, 21 – 23, 28 – 30, 52 –
55, 58 – 59