SUSTAIN ABILITY14/15 King’s Cross Central Limited Partnership 4 Stable Street London N1C 4AB April 2014 SUSTAINABILITY POLICY & FRAMEWORK SUSTAINABILITY AT KING’S CROSS SUSTAINABILITY FOCUS FOR 2014/2015 CONTENTS 02 05 17 “King’s Cross is a model of constructive conservation, that captures the special quality of London as it has grown over the centuries” English Heritage 01 SUSTAIN ABILITY POLICY & FRAME WORK 2 SUSTAINABILITY 2014/15 King’s Cross 01 SUSTAINABILITY POLICY & FRAMEWORK OUR DEFINITION OF SUSTAINABLE DEVELOPMENT A development which brings lasting environmental, economic and social benefits to the project and to the wider community. Furthermore, a sustainable development is delivered and managed with consideration for optimising the use of materials and resources. This document sets out the King’s Cross Partnership’s vision for a sustainable King’s Cross and our approach to achieving our goal. Sustainability at King’s Cross King’s Cross is one of the most significant regeneration opportunities in London – and the UK. The 67-acre site has a rich history, a unique setting, and is adjacent to the best connected transport hub in London. The environment being created at King’s Cross will be a community for future generations. By 2020, 45,000 people will live, work and study here. The scale and nature of the project presents a rare and exciting opportunity - and a great responsibility. In every sense, we are committed to delivering a development for London that is built on sustainable values. Our vision Our vision for King’s Cross is to deliver a sustainable development for London – a lasting place for people and a community with a long-term future that supports changing patterns of social and economic behaviour. Delivering the vision This vision can only be realised by working in partnership with a wide range of stakeholders; investors, consultants, contractors, government agencies, local authorities, interest groups, charities, schools, businesses and residents themselves. We invest much time and effort on building strong relationships and mutual understanding with our partners. The relationships are always based on openness and trust, and a desire to create shared value. By working in partnership, we can identify issues, shape our responses and find better, smarter ways to do things. This forms the basis of our approach, and has been crucial to the success of the project to date. 99%OF THE DEVELOPMENT’S HEAT DEMAND IS MET FROM THE ON SITE ENERGY CENTRE above THE DEVELOPMENT On completion, 50 new buildings, 2,000 new homes, 20 new streets, 10 new public squares, 67 acres, and 45,000 people who live, work and study in the area 3SUSTAINABILITY 2014/15 King’s Cross 01 SUSTAINABILITY POLICY & FRAMEWORK Our guiding principles These principles guide and underpin every aspect of the King’s Cross development – from plan-making through to design, construction and management. From how we work with communities to how we look after our teams. 1. Consider the whole place We strive to make King’s Cross work as a whole – physically, economically, environmentally and socially. The “whole place” approach is about creating successful physical infrastructure, stimulating economic growth and promoting social value. These elements are critically related – and sometimes require compromise and difficult decisions - if we are to deliver a lasting, livable place. 2. Think long-term While the phasing of the development will always require consideration of short and medium term interests and needs, we have a responsibility to focus on long-term outcomes and not short-term gains. Our goal is to create a place that delivers lasting benefits for the new and the existing community, businesses, residents and society as a whole. 4. Ensure viability We believe that developing places sustainably, particularly by creating social and economic opportunities for local people, improves people’s lives. Moreover, by listening to people who are part of the place, we can tailor our programmes to ensure they address local need. This, in turn, is the key to achieving long-term viability. 3. Create shared value For King’s Cross to be successful over time, we must create lasting value – for our partners, our customers, our employees, for the local community and for London. We believe that these interests are not mutually exclusive, rather they are mutually dependent. 5. Enable behavioural change The scale and nature of the project at King’s Cross provides an opportunity to support more sustainable ways of living. From the type of projects we choose, to how we plan, build and manage them, we can facilitate new norms – in consumption patterns, in how we move around, how we use energy and water, and in civic participation. >3,000NUMBER OF PUPILS WELCOMED TO SITE (2008 – 2013) above SCHOOLS PROJECTS Our schools program aims to engage local young people with the development project and ensure that they have the chance to benefit from all the investment that is going on here. 02 SUSTAIN ABILITY 5SUSTAINABILITY 2014/15 King’s Cross 02 SUSTAINABILITY This section summarises regeneration and environmental activities at King’s Cross 2008 - 2013 and discusses lessons learnt so far. From the very outset of planning the development, much work was done to explore the range of sustainability initiatives which could be implemented at King’s Cross. This work is captured in “Principles for a Human City” of 2001; and in the “Regeneration Strategy” of 2004. Our planning approvals achieved in (2007) include a set of legally binding commitments, drawn together in a Section 106 Agreement. Several of these obligations are technically and commercially challenging. Some are far-sighted, anticipating regulatory and technological innovation. Many are quantifiable, so performance can be measured. While our focus has been on meeting our obligations, our philosophy is to always look to go further where it makes sense to do so; either because better outcomes can be achieved by investing more time and effort; or because commercial forces dictate that we reach a still higher benchmark. King’s Cross is being developed in a series of phases. As each phase begins, planning obligations are triggered, requiring increased provision of facilities, services, programmes and monitoring. During the first phase of development, we laid the foundation for an embedded regeneration and environmental management programme by delivering projects triggered early on and others which we thought it was of value to deliver ahead of time. We have also delivered a number of projects which go beyond our obligations in order to further explore what might work in the context of King’s Cross. With five years of development under our belts, we are now in a position to make a meaningful assessment of progress against our commitments; and to reflect on our experience so far. This will inform the next phase of development, when there will be an acceleration of projects triggered and an expansion in delivery of existing obligations as well as more opportunities to go above and beyond on the completed estate. To date, we have in most cases met, and gone beyond the legal requirements – often ahead of schedule. In some areas however, we have been challenged, and the commitments have proved difficult to achieve. We discuss this in the “lessons learnt” section. c.9,000m2 OF GREEN/BROWN ROOFS DELIVERED OR PLANNED WHICH IS EQUIVALENT TO ONE FOOTBALL PITCH SUSTAINABILITY AT KING’S CROSS above GREEN WALL Soil free hydroponics have been used to enhance the bare walls of Goods Way SUSTAINABILITY 2014/15 King’s Cross 6 ST PA N CRAS W AY L COLLEGE STREET PANCRAS ROAD PANCRAS ROAD MIDLANDROAD NDALE ROAD CHARRINGTO N STREET CHALTO N STREET BRILL PLACE EVERSHO LT STREET O SSULSTO N STREET OAD EUSTO N ROAD REGENT SQUARE CARTW RIGHT GA JUDD STREET ARGYLE STREET CRESTFIELD STREET ACTON ST SWINTON STRE KING’S CROSS ROAD PENTONVILLE ROAD C A LED O N IA N RO A D YORKWAY WHARFDALE ROAD COPENHAGEN STREET CANAL REACH HANDYSIDE STREET STABLESTREET KING’SBOULEVARD GOODS WAY CAMLEY STREET YORKWAY KING’S CROSS STPANCRAS BASIN BATTLE BRIDGE PLACE FRANCIS CRICK INSTITUTE KING’S CROSS SQUARE GRANARY SQUARE BEACONS F’LD ST. YORKWAY TAPPER W . TON TION BRITISH LIBRARY FRANCIS CRICK INSTITUTE ST PANCRAS INTERNATIONAL KING’S CROSS STATION ST PANCRAS RENAISSANCE HOTEL REGENT QUARTER BATTLEBRIDGEBASIN KINGS PLACE CAMLEY STREET NATURAL PARKST PANCRAS OLD CHURCH R E G E N T ’ S C A N A L R E G E N T ’ S C A N A L 1 2 13 9 10 123 4 11 8 7 5 6 OUR SUSTAINABILITY INITIATIVES FALL INTO THESE 8 CATEGORIES: Regeneration • Place and heritage • Economy and employment • Education • Well-being and community Environmental Management • Green buildings and carbon footprint • Resource efficiency and towards zero waste • Accessibility and movement • Habitat and biodiversity 7 Sustainability features at King’s Cross: The on site Energy Centre – supplying 99% of the estate’s heat demand The Construction Skills Centre – 375 achievers to date – many of whom are going onto apprenticeships and jobs on site KX Recruit – a job matching service for local people and businesses Granary Square – over 175,000 visitors (2012 to 2013) Camden Headquarters – BREEAM Outstanding in design One and Two Pancras Square – commercial office space both BREEAM Outstanding in design c.9,000m2 of green/brown roofs delivered or planned across the site Green wall and canal side planting providing a haven for bees and other fauna Outdoor sports area free for public use The Global Generation Skip Garden – educating and connecting children and adults with sustainable business and lifestyles Heritage Buildings – 10 of the 20 buildings and structures refurbished to date with a further three on site Handyside Gardens – play space for children and a green corridor from the canal to the northern part of the development (opened 2013) Cubitt Park – one of the principal open spaces within King’s Cross Central. Envisaged as a generous area of soft landscape, it will become an important amenity space within the site. Delivered in 2014 >49,500m2 PUBLIC REALM DELIVERED 02 SUSTAINABILITY ANGEL ISLINGTON (via towpath) ONE MILE FROM GRANARY SQUARE REET EET D WYNFORD STREET SUSTAINABLE DEVELOPMENT INITIATIVES SUSTAINABILITY 2014/15 King’s Cross above PUBLIC SPACES, PEOPLE SPACES 40% of the King’s Cross development area is public realm left KING’S CROSS MASTERPLAN Projected build out by 2020 1 BRE Environmental Assessment Method SUSTAINABILITY 2014/15 King’s Cross 8 >175,000VISITORS TO GRANARY SQUARE (2012 – 2013) 02 SUSTAINABILITY Ensuring that the local community benefits from the investment at King’s Cross is at the heart of the Partnership’s approach to sustainable development. The Community and Regeneration Programme has been established to help improve the socioeconomic opportunities available to those in the surrounding area and to make them accessible to local people. As well as an improved environment, there are a range of housing available, job and training opportunities, programmes for schools, business initiatives, community projects and new public facilities. The programme has been developed, and is being delivered, in close collaboration with a range of stakeholders and partners. Some key highlights include: The Construction Skills Centre The Construction Skills Centre helps local people to access the jobs and opportunities created by the development. Over £2 million was invested in the Centre, which has been operating from a purpose-built facility since 2008. The Centre provides training and helps young people gain qualifications, apprenticeships and job placements on the development. All King’s Cross construction partners are signed up to support the project. To date, 375 young people have gained a qualification, and there have been over 700 apprenticeship placements through the Centre. The Global Generation Skip Garden This inspirational project started as a mobile vegetable garden built in skips and has expanded into a community project which provides all kinds of opportunities for local youngsters. The project has engaged with over 3,000 young people since opening in 2009. Through the medium of sustainability, young people have developed new skills and networks, learnt about construction, how to grow food as well as how to market and sell their produce. This project has helped to breakdown social stereotypes of all types – and helped build trust and social capital on the site. KX Recruit This job matching service helps people living in Camden and Islington to find work at King’s Cross and helps King’s Cross-based employers to find the right candidates to fill their vacancies. The service launched officially in January 2014, and has already placed 30 local people in jobs across the estate. King’s Cross Schools Programme The schools programme supports local primary and secondary schools with curriculum-based learning opportunities, work experience and careers advice. The support can range from talks and field trips focusing on particular subject areas to more in-depth projects which have a longer time-frame and which are delivered in partnership with education specialists. King’s Cross and St. Pancras Business Partnership (KXSP) This network of local businesses works together to promote King’s Cross as a vibrant and dynamic location within London. The Partnership was instrumental in setting up KXSP in 2011. The goal is to maximise the potential of the area, improve the environment and to ensure that the wider area benefits from the investment being made in redevelopment. REGENERATION above OPEN SPACES Granary Square, with its 1080 fountains, is a busy London square and hosts a myriad of events throughout the year SUSTAINABILITY 2014/15 King’s Cross 9 02 SUSTAINABILITY 375ACHIEVERS FROM THE CONSTRUCTION SKILLS CENTRE – MANY OF WHOM ARE GOING ONTO APPRENTICESHIPS AND JOBS ONSITE Activity Key Figures Place and Heritage Affordable homes occupied 289 Number of buildings and structures to be restored and refurbished in 2013 3 Number of archaeological items logged 138 Number of arts projects at King’s Cross since 2008 > 20 Public realm delivered > 49,500m2 Economy and Employment Construction Skills Centre NVQ achievers (September 2008 – December 2013) 277 Level I 98 Level II Average number of apprentice placements on site monthly during 2013 28 Local apprentices on the construction site (monthly average 2013) 26 (3.1%) Local employment on the construction site (monthly average 2013) 78 (7.9%) Local employment within the King’s Cross Estate Services team (as at December 2013) 40% Employees placed by KX Recruit (September to December 2013) 30 King’s Cross and St Pancras Business Partnership members to date 11 Education Number of further education students and staff on-site at University of the Arts, London 5,000 Number of child places within the King’s Cross Nursery, Academy and Frank Barnes School for the Deaf to be provided 481 Number of school pupils welcomed to site 2008 – 2013 > 3,000 Children and young people involved with the Global Generation Skip Garden 2009 - 2013 2,864 Well-being and Community Number of people engaged in on-site enlivenment activities (2012 - 2013) > 175,000 Number of visitors to the Varini viewing platform > 114,000 Number of business volunteers at Global Generation Skip Garden (2012 - 2013) 734 KEY REGENERATION FIGURES (2008 – 2013) above CONSTRUCTION SKILLS CENTRE The CSC helps local people to access the jobs and opportunities created by the development. The Centre provides training and helps young people gain qualifications, apprenticeships and job placements on the development SUSTAINABILITY 2014/15 King’s Cross 10 02 SUSTAINABILITY ENVIRONMENTAL MANAGEMENT King’s Cross has extraordinary potential to be a sustainable development: - From this central location, next to the largest transport interchange in the UK, sustainable travel is the obvious choice. - The scale of development, and the fact that it was largely unserviced prior to development, has provided a rare opportunity for planned infrastructure and utilities. - The density, proposed massing of the buildings, and the standards to which they are being designed, built and refurbished are inherently sustainable. In addition, with an estimated 45,000 people living, working and studying here by 2020, we are in a position to facilitate sustainable lifestyles and behaviours. We can work with residents and occupiers to help ensure sustainable occupation of the buildings, to provide for and encourage sustainable transport choices, as well as to establish a retail offer that supports a sustainable ethos. Some key highlights for environmental management at King’s Cross to date: Carbon efficient energy provision The focus for energy efficiency at King’s Cross is a district-wide energy system – one of the largest of its kind in the UK. An on-site Energy Centre generates power and heat via Combined Heat and Power (CHP) engines. Each new building connects to the Energy Centre through the district heating network. This is a very efficient way to heat the buildings and it means that there will be no need for conventional boilers in the buildings themselves. The Centre provides close to 100% of the development’s heat and hot water needs and around 80% of its electricity needs will be offset. “Future-proof” infrastructure The site-wide network of pipes, cables and fibre optics that has been installed at King’s Cross has spare capacity designed from the outset. Every effort has been made to use adaptable and future proof technologies. BREEAM Achievements The planning agreements require that all office buildings at King’s Cross are designed to a BREEAM rating of “Very Good”. In practice, the Partnership aims to achieve “Excellent” and “Outstanding” for all new buildings. One ‘Outstanding’ building has already been delivered; and two further ‘Outstanding’ buildings are expected to complete in 2014. 79%OF THE DEVELOPMENT TOTAL POWER DEMAND IS OFF-SET BY THE CHP ENGINES above PINK ENGINE The first Jenbacher Gas Engine arrived in 2011 from Austria for installation within the Energy Centre. 11SUSTAINABILITY 2014/15 King’s Cross 02 SUSTAINABILITY 2,864CHILDREN & YOUNG PEOPLE INVOLVED WITH THE GLOBAL GENERATION SKIP GARDEN (2009-2013) Green Buildings and Carbon Footprint Commercial Buildings Sustainability Ratings – (BREEAM) – Delivered by King’s Cross Central Partnership COMPLETED New / Refurbishment BREEAM Rating Scheme Year Score (min. 55% req.) EPC Rating One Pancras Square New Outstanding 2008 89% A (22) University of Arts London Refurbishment Very Good 2008 59% C (65) Western Transit Shed Refurbishment Excellent 2008 79% B (31) 2 Granary Square Refurbishment Very Good 2011 59% C (54) IN CONSTRUCTION New / Refurbishment Design Phase BREEAM Rating Year Design Phase Score Illustrative EPC Two Pancras Square New Outstanding 2008 87% A (22) Five Pancras Square New Outstanding 2008 93% A (22) Stanley Building Refurbishment Excellent 2008 73% B (36) Plimsoll Building New Excellent 2011 72% T5 New Excellent 2011 73% German Gymnasium Refurbishment Excellent 2011 above THE GLOBAL GENERATION SKIP GARDEN This inspirational project is doing amazing work with local young people. It started with a sustainable vegetable garden built in skips and has expanded into community project which provides all kinds of opportunities for local young people. SUSTAINABILITY 2014/15 King’s Cross 12 02 SUSTAINABILITY Green Buildings and Carbon Footprint Residential Buildings Sustainability Ratings - Code for Sustainable Homes (CfSH) COMPLETED CfSH Rating (level 4 required) Year Completed Score Saxon Court Level 4 2012 75% Rubicon Court Level 4 2012 65% ArtHouse Level 4 2013 69% IN CONSTRUCTION Design Phase CfSH Rating Scheduled Completion Design Phase Score Tapestry Level 4 2014 71% Plimsoll Building Level 4 2014 IN PLANNING Cubitt Park Residential (R5 S) Level 4 2016 69% Activity Information Resource efficiency and towards zero waste The percentage of heat and hot water to be provided by the on site Combined Heat and Power Plant 99% Photovoltaic capacity installed and planned at King’s Cross 2008 - 2015 (set to save 104 tonnes of CO2 emissions) 200,000 kWh per year Proportion of construction waste diverted from landfill 2008 – 20131 76% Proportion of public estate waste recycled 2012 - 2013 81% Accessibility and Movement Number of public bicycles spaces to be installed on-site 977 (432 are available now) Publication of updated Area Travel Plan February 2014 Number of HGV drivers trained in cycle safety on site in 2013 25 Considerate Contractor Scheme % of projects achieving 80% or over 100% Habitat and Biodiversity Green wall installed in 2012 200m Percentage of roof area completed or in development to be green or brown roofs 32% 81%PROPORTION OF PUBLIC ESTATE WASTE RECYCLED (2012-2013) above SKIP GARDEN The garden uses local materials – and in this case that means building materials. So the gardens have been planted in upcycled skips, and the polytunnel was created using spare water pipes, scaffold netting and planks from the site. 1 Data available for 87% of development waste, by spend. SUSTAINABILITY 2014/15 King’s Cross 13 02 SUSTAINABILITY 977NUMBER OF PUBLIC BICYCLES SPACES TO BE INSTALLED ON SITE While delivering our sustainability initiatives has been rewarding, it has not always been smooth sailing. As the early projects complete, we now have the opportunity to examine our performance and to reflect on what has worked well, and the areas that have challenged us. This experience and knowledge will help inform how we work going forward. 01 Partnership is key The importance of partnership and the early and ongoing involvement of a wide range of stakeholders cannot be overstated. It is crucial not only to the successful delivery of the project, but also in building support and creating a sense of ownership in the wider community. These relationships work best when built on openness and trust and with the common goal of creating shared value. Sometimes both sides have to compromise. 02 Flexibility is important For a project such as King’s Cross – with a development span that stretches over more than a decade – flexibility is key. It allows for changing or unforeseen circumstances and for experience gained along the way. As well as this, objectives and commitments defined at the outset of the project can become irrelevant, suboptimal or even detrimental over time. Flexibility is more possible in a culture of partnership working where there is an element of trust on both sides. Renewable energy technologies are an example of this. In 2006, when planning consent was granted, wind turbines were considered an appropriate renewable energy source. Technology has progressed since then, and flexibility with the London Borough of Camden has enabled the team to agree a more appropriate approach to efficiency and renewable energy through photovoltaics, Combined Heat and Power and superior building performance. 03 Be bold Firmly embedding bold ideas from the outset ensures that they have a better chance of becoming reality – rather than being “nice-to-haves” which are eroded over time. The King’s Cross Public Arts Programme illustrate this. The programme was established in 2006 with a bold ambition, “to incorporate contemporary works of such high quality and innovation that King’s Cross becomes an international destination for the arts.” The projects delivered since 2011 have indeed achieved this goal, attracting visitors from across London, the UK and from further afield; and receiving international media attention. The innovative approach to incorporating art into the landscape and built environment has helped to establish Kings Cross as a popular and dynamic destination. LESSONS LEARNT above CARING FOR CYCLISTS The roads are calm and pedestrian - and cyclist-friendly, designed to keep car speeds down. And a bicycle interchange will mean that bikes can be left, safe and secure. “... flexibility is more possible in a culture of partnership working where there is an element of trust on both sides.” SUSTAINABILITY 2014/15 King’s Cross 14 04 Targets should be informed by experience While we have been successful in the delivery of the Construction Skills Centre and in providing education opportunities, achieving some of the precise construction employment and apprenticeship targets has been difficult. This is due to a number of factors, including; a limited pool of applicants within the stipulated criteria (16-18 living within central impact zones of Camden and Islington), and the challenges of taking on young apprentices who have to gain certain construction experience to gain a qualification within current construction practices. During 2014, we hope to negotiate with the local authorities to remodel our provision based on our experience to date. The focus will be on quality of training and opportunities rather than quantity. This continues to be an important area during the development phase of King’s Cross. 05 Phasing requires careful consideration As new areas of the development open to visitors, occupiers and residents, thought needs to be given to accessibility, to establishing a sense of place and community and to requirements and services in the short-term. This requires commitment and upfront investment from the developer. Similarly, the later phases of development will have increased environmental legislative requirements and we need to consider how we can continue to go further than our commitments and drive progress in sustainable development. 02 SUSTAINABILITY >114,000NUMBER OF VISITORS TO THE VARINI VIEWING PLATFORM “... the latter phase of development will have increased environmental legislative requirements and we need to consider how we go further and drive progress in sustainable development.” above ACROSS THE BUILDINGS The third instalment of RELAY, the dedicated, curated art programme at King’s Cross by Swiss Artist Felice Varini SUSTAINABILITY 2014/15 King’s Cross 15 02 SUSTAINABILITY 06 Call on specialist support when necessary It has been important to recognise our role and our capabilities, and to call on specialist help in certain areas of the programme – to facilitate delivery, boost knowledge and help achieve targets. For example, we know a lot about development processes but not much about the national curriculum. So working with an educational expert has helped frame our knowledge to have better impact when we work in schools and in delivering the King’s Cross Academy. 07 Public realm matters People’s perception of King’s Cross is greatly influenced by their experience of the public realm. High-quality spaces that capitalise on the site’s heritage and setting have been fundamental to creating a sense of place. Investing early in key spaces – such as Granary Square – has been vital in establishing King’s Cross as a destination. Moreover, the public space at King’s Cross has become a valuable amenity – for the local community and for all of London. An inclusive approach to the management of the public realm and high levels of cleanliness and security has also been critical. This responds directly to issues raised ten years ago during consultation about the accessibility and standard of the public realm at King’s Cross. 08 Early engagement is important to achieve BREAAM targets Achieving BREEAM “Excellent” and “Outstanding” ratings requires engagement with BRE, and consideration early in the design process. This has been particularly important in the delivery of biodiversity and habitat objectives. Achieving green roof targets requires consideration at the estate level, not just at the individual building level. 200mOF GREEN WALLS INSTALLED DURING 2012 “... the public space at King’s Cross has become a valuable amenity – for the local community and for all of London.” above GREEN WALLS & BROWN FIELD This rich industrial heritage is both respected and reused at King’s Cross. More than 20 historic buildings and structures are being creatively refurbished and given new uses. This has led to King’s Cross being named as “One of England’s 20 Best Heritage-Led Developments” by English Heritage. 03 SUSTAIN ABILITY FOCUS FOR 2014/2015 SUSTAINABILITY 2014/15 King’s Cross 17 03 SUSTAINABILITY FOCUS FOR 2014/2015 Regeneration Programmes for 2014/2015 include: Place and heritage • Deliver the public arts programme, including employment of two curators, provide artwork within buildings and a major public art installation for summer 2014/2015 Economy and employment • Through the Construction Skills Centre, continue to deliver the Contractors Forum, employment meetings and develop a refreshed three-year support plan for apprenticeships and local employment with LB Camden • Undertake an annual update of the Labour Market Model • Deliver the KX Recruit local employment service Education • Build on school relationships to ensure site visits and curriculum opportunities are seized Well-being and community • Establish an on-site resident activity pilot programme together with One Housing Group • Engage with the London Wildlife Trust and Global Generation to establish site wide office occupier membership and activities • Identify volunteering opportunities for residents and occupiers by piloting an on-site Business Volunteering Programme. Assess outcomes with LB Camden with a view to developing a wider programme and supporting website • Continued support and development of the King’s Cross and St Pancras Business Partnership • Support and partnership work with Islington Giving and Team Cally Environmental Management Programmes for 2014/15 include: Green buildings and carbon footprint • Continue to deliver BREEAM and CfSH buildings • Deliver timely and accurate reporting for investors and industry regulators • Provide guidance to occupiers to achieve green building standards during fit-out • Establish a post-occupancy programme to enhance occupier experience and facilitate the sustainable occupation and operation of buildings Resource efficiency and towards zero waste • Establish regular environmental reporting and targets for key impact areas for all sites under Partnership management, through the Construction Environmental Management Programme • Establish appropriate property management environmental reporting in preparation for CRC Energy Efficiency Scheme and allow for monitoring the delivery of sustainable design • Achieve ISO14001 EMS certification for the King’s Cross estate Accessibility and movement • Deliver the Area Travel Plan - actions include supporting occupiers to prepare Workplace Travel Plans Habitat and biodiversity • Undertake a review of biodiversity with London Wildlife Trust (LWT) • Share data on green and brown roof performance with LWT Û ENSURE LOCAL SCHOOL VISITS TAKE PLACE, AND CURRICULUM OPPORTUNITIES ARE DEVELOPED During 2014/2015, the Partnership will continue to deliver and monitor the regeneration and environmental programmes at King’s Cross. With buildings now occupied and the development increasingly accessible to the public, focus will be on embedding sustainable practices across our operational activities, facilitating sustainable occupation and engaging with visitors and local community to strive toward our vision of King’s Cross as a sustainable place. above WORK EXPERIENCE We currently support a number of work experience placements for Camden and Islington pupils. In the future, we aim to expand this by working with partners on the King’s Cross development. www.kingscross.co.uk ©AngelaInglis